Challenges we encountered during the project and how we overcame them
Due to the nature of the project, we had to ensure that we only conducted works at certain times. This was usually in half terms and school breaks. This was so that we didn’t create disruption for the children learning and being cared for in the school. To ensure that our electrical work was completed in the required timeframe, we had constant communication between our lead and the project manager for Riverside School. We were incredibly organised, with the work in every room being scheduled to work around children potentially using the rooms to learn or sleep in. Our team completed the work to the highest standard in the agreed upon timeframes.
Although we worked in school breaks, there was the odd occasion where children, carers and teachers were still in the school. This meant that we had to work alongside them, ensuring that our safety precautions were excellent. We conducted RAMS (risk assessment and method statement) prior to starting the work, which allowed us to identify how best to work in the space whilst reducing any risks. Our entire team are all DBS checked, putting our client at ease.
During the project, there were certain points where we were required to use high level lifts and access equipment. Our team is highly trained in this, and took all the safety precautions necessary during the process.